Project characteristics

New terminal of local air lines

20 500 m 2
Terminal area
5 floors
The height of the terminal building
13 200 m 2
Landscaping area
600 PAX/HOUR
Throughput
Up to 1 000 000 PAX
Annual passenger traffic

About the project

As part of the project, it is planned to build a new passenger terminal of local air lines, which will be able to serve up to 1 million passengers per year.

The new international airlines terminal of Khabarovsk International Airport will be equipped with 2 jetways, 7 elevators for various purposes, 6 escalators, 2 levels of automated baggage handling and 11 check-in counters.

Amendments to project documentation, including for state expert examination, development of BIM-based engineering documentation, turnkey construction works, including the full range of MEPs under the turnkey contract.

The customer of the project
Khabarovsk International Air Terminal, JSC and Khabarovsk Airport, JSC
The general designer of the project
DBC Consultants, LLC
The General Contractor
Limakmarashstroy, LLC