International Airport
Volgograd

Project map - International Airport

Project Characteristics

Airport infrastructure

terminal B
new terminal B
9 200 m 2
Terminal gross area
up to 720
people - capacity
B, С
terminal connection

Airfield infrastructure

2 800*45 м
runway
terminal B
equipped with teletraps

About the project

Limak Marash Group of Companies completed the construction of the airport in May 2018. As a result, a new transport hub appeared with a runway, terminals of domestic and international air lines, a cargo complex, hotels, parking lots, office and administrative buildings.

Volgograd Airport provides passengers with a range of services necessary to make travel comfortable and safe. In 2019, passenger traffic amounted to 1.2 million people.

The construction of the terminal complex of international and domestic air lines of Volgograd International Airport was implemented as part of the Preparation Program for the 2018 FIFA World Cup in the Russian Federation.

The customer
Volgograd International Airport, LLC
The technical customer
Meridian Development
The general contractor
Limakmarashstroy, LLC
Construction period
March 2017 - May 2018