Project Characteristics

56 600 m 2
The built-up area
12 m
The ceiling height
12 x 18 m
Column pitch
1,2 m
Floor level

About the project

The modern warehouse complex meets the strictest international quality standards. The construction was performed by the experienced general contractor Limak Marash Group using quality materials with the introduction of energy-saving technologies, which was essential to optimize operating costs. The general contract included turnkey construction works, such as supplies, designer's supervision and services for the design and construction of the facility.

The general contractor
Limakmarashstroy, LLC
Completion dates
March 2015 — August 2015