Construction stages of the project Eastern departure from Ufa

05.05.2023
Video

Our video demonstrates the current status and performance indicators of the Eastern Exit project from Ufa to the Federal highway M-5 Ural in Bashkiria.

The implementation of the project for the construction of a regional highway of the Republic of Bashkortostan «New exit from Ufa to the federal highway M-5 Ural – Eastern Exit» includes three large-scale stages.

The first stage is a road tunnel, which includes two tunnels 1.2 km long, with two lanes in each. The width of the road will be 8.5 m x 2.

The second stage is a steel bridge over the Ufa River with a length of 470 m and an overpass with a length of 2,200 m, with two two-lane platforms. The width of the roadway will be 27.7 m.

The third stage is a 12 km long highway with four lanes. The category of the road is IB (express). The width of the road is 26 m.

Construction stages of the project Eastern departure from Ufa-photo-1