Bridge construction in the modern world has reached a new technological level, both in terms of the use of high-strength building materials and construction techniques.
Bridges vary in the following parameters:
Bridge operation is connected with strong environmental impact and intensive loads, therefore, special importance is attached to the quality of used construction materials and strict observance of construction technologies.
The key to successful construction is careful planning, precise calculations and pre-project preparation.
The preparatory stage includes a feasibility study, selection and approval of the site for construction with the execution of documents, obtaining specifications for connection to utility networks. Then the design is developed with subsequent approval and working documentation.
Different materials (reinforced concrete, concrete, steel) are used for bridge construction. Aluminium is another material that has only recently begun to be used in bridge construction.
The implementation of the project involves a large complex of engineering and construction and installation work on land and water, which places high demands on the observance of occupational health and safety.
In addition to the construction of the artificial structure, the shoreline is being reinforced and the supports are being protected against mechanical impact. In addition, access roads are built, electricity is supplied and the surrounding area is landscaped.
Bridge construction starts with a complex of engineering and geodetic surveying. Measurements, analysis of soils and water area are made in the process, the most suitable area for construction is chosen. The construction itself consists of several stages:
The Turkish LMS, a parent company, has been involved in the construction of bridges, overpasses, flyovers, transport tunnels and interchanges for many years and provides all set of design and bridge construction services. The portfolio of completed projects includes:
Build the history, proud of the result!