International airport, Volgograd

Technical Data

Airport infrastructure
• New building of the terminal B 
• Gross buildings area is 9 200 m2
• Connection of the terminal B with the existing terminal C
• Planned airport capacity is up to 720 passengers per hour 

Aerodrome infrastructure
• Landing strip – 2 800*45 m
• Equipping of the terminal B with telescopic passageways

 

 

 

 

Project information

Construction of air-terminal complex for international and domestic air lines in Volgograd is implemented within the Program of preparation to the 2018 World Football Cup in Russia. A new transportation connection point with the modern air terminal and landing strip will become the result of the construction project.

• Customer: LLC “International Airport Volgograd” 
• Technical Client: LLC “Meridian Development” 
• Planned construction period: March, 2017 – May, 2018