Technical Data

Aerodrome Infrastructure

-power supply and CCTV cabling - 58 000 m (I stage)/4 000 (II stage)

- light poles installation  - 118 pcs (I stage)/ 32 pcs (II stage)

-heat supply connection arrangement  - more than 4000 m (I stage)/950 m (II stage)

-domestic and storm water drainage plumbing - 6000 m (I stage)/ 719 m (II stage)

-landscaping area - 40 000 m2